Kettering General Hospital The Kettering General Hospital Foundation Wing contract was 2 years in duration. It was a Procure 21 Project, with Interserve as the Main Contractor, which provided a state of the art, 16-Bed ITU with Trumpf multi-movement, articulated pendants. There were dual circuits at each bed, a...
Read MoreTeesside Renewable Energy Plant The Teesside Renewable Energy Plant is the largest Biomass (Waste Wood) Power Station to be built in Europe, with a total construction value £650 million. It is a joint venture between Samsung and Technicas Reunidas (TR) and it will use around 250,000 tonnes of wood...
Read MoreOxford Nanopore Lab Oxford Nanopore Technologies is an innovative research facility working on DNA/RNA sequencing technology. The DNA/RNA sequence data is used widely in scientific research as well as in several applied markets. Clean rooms are controlled environments, providing the secure, sterile environments that are vital for research and...
Read MoreNHS Nightingale Yorkshire As part of the UK government response to the Covid-19 pandemic, 7 emergency critical care hospitals were built in England in quick time, including one in the Harrogate Convention Centre: ‘NHS Nightingale Yorkshire and the Humber’. They were designed to provide care to the worst affected...
Read MoreNorthern General Hospital Laboratory Rationalisation This project’s goal was to centralize all the labs of Sheffield Teaching hospitals into one location. We supplied the medicine unit with: Helium Nitrogen Argon Compressed air Oxygen We installed a range of supply manifolds for those gases, pipework distribution network to the relevant...
Read MoreSheffield Childrens Hospital Major new development construction Major plant, manifolds and infrastructure upgrade, Medical oxygen, air and vacuum systems This project was developed in two distinctive parts – the enabling section and the main extension construction phase. The enabling work section consisted of the design and installation of new...
Read MoreSheffield Hallamshire Q and A Floor Theatres Suites The Medical gases used on this project were: Oxygen, Medical Air, Surgical Air, Vacuum & AGSS. To ensure no loss of gases during operations, these were fed from 2 existing risers so that the theatres had supply from both, in case...
Read More